SH-500 / SH-30 OPERATION PROCEDURE
-
Make specimens by Plastic Molds.

-
Prepare load cell for each size specimen.
※500kN (50ton) and 30kN (3ton) load cell for column ground improvement test are available.

-
Proceed the test in Peak Hold Mode.

-
Set the specimen at the center of Tester and cover the shatter proof cover
Close the Valve of manual pump

-
Move up and down the handle of manual pump and load specimens.
Compressive strength will be indicated in digital as well as broken by pressure of specimen.

-
Reduce the pressure to open the valve of manual pump.

